BUSINESS | 19:04 / 17.12.2019
625
1 min read

EPSILON: Developing gas transportation system in Kashkadarya in cooperation with Uzbekneftegaz

Round-the-clock construction of three gas pipelines continues: “Tandircha CP – Shurtanneftegaz” (45 km), “Chigil CP – Mubarek GPP” (110 km) and “Talimarjon CP – Shurtanneftegaz” (8 km).

Total for December 17:

  • 43,700 t of pipes shipped;
  • 28,100 t of pipes arrived;
  • 90.3 km of trenches dug;
  • 111.7 km of pipes welded;
  • 71.2 km laid.

EPSILON Press Office

Жамшид Рузибаев
Prepared by Жамшид Рузибаев
Follow Kun.uz news on Google News
+ Subscribe

Related News