SOCIETY | 17:33 / 01.02.2023
6637
1 min read
ADS
EPSILON (EDC): Daily flow rate of Chigil-5 well amounted to 100,000 m³ of gas

Фото: EPSILON
On February 1, 2023, EDC obtained an industrial post-frac inflow of gas from well No.5, Chigil field in Kashkadarya region.
Shortly, the well will be connected to the main pipeline and begin supplying natural gas to the domestic market.
Epsilon Press Office
Related News

18:07 / 21.08.2024
Major fire breaks out on gas pipeline in Kashkadarya

09:16 / 30.01.2023
EPSILON (EDC): New Tolibtepa field discovered with possible reserves of 2 bcm of gas

10:51 / 29.01.2023
EPSILON (EDC): Production rate of Talimarjon-4 well amounted to 30,000 m³ of gas per day

10:23 / 29.12.2022