SOCIETY | 10:24 / 24.06.2024
1820
1 min read

Urgench Airport to be closed for runway repairs

Urgench International Airport will suspend operations from July 20 to August 7 due to major repairs of the runway. During this period, all scheduled flights will be redirected to Nukus airport, Uzbekistan Airports reports.

Photo: Uzbekistan Airports

In addition, passengers will be provided with a transfer between the airports of Nukus and Urgench.

“In particular, it is planned to replace and strengthen the runway surface along the entire length of 3,000 m and a width of 16 m. A major overhaul of the surface of the second and third taxiways will also be carried out,” the report reads.

It is noted that after the completion of a major overhaul of the runway, Urgench Airport will be able to accept wide-body aircraft such as Boeing 787 and Airbus A330 without restrictions.

The last major reconstruction of the runway at Urgench airport was carried out in 1997, and partial repairs of damaged areas were carried out in 2018.

Related News